Program

Seaway Heavy Lifting - Challenges of Heavy Lifting

Location: Leeuwen Room II
Time: 19 April 12:30 - 13:30

12.30 hrs

Mr. Ruud Buitenhuis, Structural Engineer

Challenges of Heavy Lifting

Installing a 5000 ton platform involves some serious preparation in the office. There are obvious items like the rigging arrangement, but usually the non-obvious items require most attention. What do you do when a liftpoint is covered by a heli-deck? How do you position a heavy load? These and other questions will be addressed during the Seaway Heavy Lifting presentation.